The 2 weeks of the technical skills was tough, I am very much a perfectionist and when I couldn't get every detail correct it frustrated me a lot. Due to this, I struggled a lot with timing and getting everything done within the two weeks. Overall, I feel that I did okay with this project despite the fact that it has been the most stressful yet.
Paper toy
At the end of the two weeks of technical skills I had to put them to the test. I chose to keep my work traditional for this as it was only my second project and I didn't have a lot of technical experience. I first researched some design ideas and net layouts and drew out my own design ideas for the nets and the graphics. I made mock ups to see if my design was correct and fit what I wanted it to look like.